Request for Cost Estimate: Engineering Services

Description of Project: Mountain Projects, Inc.  Located in Waynesville, NC, is soliciting cost estimates for Architectural/Engineering Services for a 5.97 acre single family development. 

Property: Off Harkins Avenue Canton, NC 28716 PIN 8647-83-7739

The scope of work may include but is not limited to the following:

  • Site Plan
  • Compaction Report
  • Timeline of Development Phases 
  • Wetland/ Stream Delineation
  • Phase 1 Environmental & 3D Geotechnical Exploration
  • Soil Sample
  • Infrastructure, Property Layout & Project Feasibility
    • Grading & drainage plans
    • Road design including NCDOT (Ingress & Egress)
    • Water & sewer design
    • Stormwater retention/ detention design
    • Preliminary parking and off-street loading layouts
    • Opinion of costs for infrastructure 

Applicants should have experience in educational design and be familiar with all pertinent codes and regulations. Mountain Projects, Inc. is seeking creative and economical design solutions that incorporate energy-efficient features. 

Cost Estimates may be hand delivered, emailed, or mailed to Mountain Projects Inc., 2177 Asheville Road, Waynesville, NC 28786. Cost estimates must be received by June 14, 2021.

Property is under contract and all work must be completed and reviewed by Mountain Projects, Inc. prior to the end of the due diligence period 08-18-21.

Questions regarding the RFQ should be addressed to the SMHP Executive Director, at the above address, Attn: Heather Boyd Phone (828) 452-1447 or emailed to: [email protected] 

A contract will be negotiated with the most qualified firm(s) at a compensation which is stable, fair, and reasonable to Mountain Projects, Inc.

Proposals: Mountain Projects, Inc. reserves the right to select the firm(s) which it deems to offer the best overall proposal taking into consideration all factors such as (a) past performance; (b) qualifications of professional personnel proposed for the project; (c) location and size; (d) recent, current, and projected workloads of the firm; and (e) related experience on similar projects.